Demo began the day we closed and the whole place was pretty much cleared out in 5 days. So far, we've only ran across a few minor repairs that will need to be addressed, but nothing out of the scope of the original project. Demo day #2 did bring a small surprise as we turned the water on. Apparently a pipe had been disturbed during demo heading to the 2nd floor bathroom and we had water pouring from the ceiling in the first floor bathroom. I panicked at first, but was reassured that everything was going to be gutted anyway so really all was OK. All the wet ceiling tiles and drywall came out of the bathroom, the leak was quickly identified and pipe sealed. Crisis adverted and more demo ensued.